The activity of Kenergy consists of the Development of Renewable Energy Projects based on efficiency and competitiveness. The process in which our activity consists is based on the following steps:
|
![]() |
![]() |
The activity of Kenergy consists of the Development of Renewable Energy Projects based on efficiency and competitiveness. The process in which our activity consists is based on the following steps:
|
![]() |
![]() |
– Analysis of the orography of the planned terrain. – Analysis of the solar resource of the location in order to confirm sufficient production to make the project relatively competitive. – Feasibility analysis of access to the transport network that allows to evacuate the energy produced (Substation or Line Cutting). – Previous analysis of future compliance with environmental criteria and standards (fauna, flora, etc.). – Preliminary analysis of future compliance with the necessary parameters to avoid adverse social impacts and with focus on generating an asset with clear benefits for all the inhabitants who in some way may be affected by the project. – Previous analysis of the respect to the areas affected by archaeological remains. – Conducting simulation studies of power flows and contingencies in order to have a preliminary idea of the interconnection capacity in the substation or line. |
![]() |
– Topological, topographic, geotechnical, hydrological, hydraulic studies, etc. – Basic engineering of the project – Interconnection Engineering – Manifest of Environmental Impact (MIA) – Studies required for Use of Land permit – Archeological and Social Impact Studies – Hydrographic data and Studies – Studies for crossing of existing infrastructure
|
![]() |
![]() |
|